ADC16DX370EVM

Mfr. #: ADC16DX370EVM
メーカー: Texas Instruments
説明: Data Conversion IC Development Tools ADC16DX370EVM
ライフサイクル: メーカー新製品
データシート: ADC16DX370EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADC16DX370EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the ADC type. 4 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: SPI, USB Compatible with ADC16DX370. Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADC16DX370EVM Image

ADC16DX370EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADC16DX370EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • Shipping Restrictions:
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: ADC
  • Tool Is For Evaluation Of: ADC16DX370
  • Operating Supply Voltage: 4 V
  • Description/Function: dual-channel, 16-bit ADC capable of operating at sampling rates up to 370 MSPs
  • Series: ADC16DX370
  • Brand: Texas Instruments
  • Interface Type: SPI, USB
  • For Use With: ADC16DX370
  • Operating Supply Current: 2 A
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADC16DX370EVM

ADC16DX370EVM Specifications

ADC16DX370EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 4 V

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is SPI, USB.

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed ADC16DX370

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Data Conversion IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top