ADC3242EVM

Mfr. #: ADC3242EVM
メーカー: Texas Instruments
説明: Data Conversion IC Development Tools ADC3242EVM
ライフサイクル: メーカー新製品
データシート: ADC3242EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADC3242EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the ADC type. 1.8 V operating supply voltage range Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics Interface Type: Serial LVDS Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.139480 oz of Unit Weight

ADC3242EVM Image

ADC3242EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADC3242EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: ADC
  • Tool Is For Evaluation Of: ADC3242
  • Operating Supply Voltage: 1.8 V
  • Packaging: Bulk
  • Description/Function: ADC3242 evaluation module
  • Series: ADC3423
  • Brand: Texas Instruments
  • Interface Type: Serial LVDS
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.139480 oz

ADC3242EVM

ADC3242EVM Specifications

ADC3242EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 1.8 V

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is Serial LVDS.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Data Conversion IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.139480 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top