| Mfr. #: | ADS114S08EVM |
|---|---|
| メーカー: | Texas Instruments |
| 説明: | Data Conversion IC Development Tools ADS114S08EVM |
| ライフサイクル: | メーカー新製品 |
| データシート: | ADS114S08EVM データシート |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the ADC type. 3.3 V, 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: USB Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.252027 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS114S08EVM Specifications
A: At what frequency does the Manufacturer?
Q: The product Manufacturer is Texas Instruments.
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: What is the Type of the product?
Q: The Type of the product is ADC.
A: What is the Operating Supply Voltage of the product?
Q: The Operating Supply Voltage of the product is 3.3 V, 5 V.
A: Is the cutoff frequency of the product Brand?
Q: Yes, the product's Brand is indeed Texas Instruments
A: At what frequency does the Interface Type?
Q: The product Interface Type is USB.
A: What is the Product Type of the product?
Q: The Product Type of the product is Data Conversion IC Development Tools.
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.
A: Is the cutoff frequency of the product Unit Weight?
Q: Yes, the product's Unit Weight is indeed 0.252027 oz