ADS7041EVM-PDK

Mfr. #: ADS7041EVM-PDK
メーカー: Texas Instruments
説明: Data Conversion IC Development Tools 10-bit 1MSPS SAR ADC Performan Demo Kit
ライフサイクル: メーカー新製品
データシート: ADS7041EVM-PDK データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS7041EVM-PDK Overview

This product is manufactured by Texas Instruments. Demonstration Kits This device belongs to the ADC type. 1.8 V to 3.6 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: SPI Compatible with ADS7041. Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADS7041EVM-PDK Image

ADS7041EVM-PDK

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS7041EVM-PDK Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Demonstration Kits
  • Type: ADC
  • Tool Is For Evaluation Of: ADS7041
  • Operating Supply Voltage: 1.8 V to 3.6 V
  • Series: ADS7041
  • Brand: Texas Instruments
  • Interface Type: SPI
  • For Use With: ADS7041
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADS7041EVM-PDK

ADS7041EVM-PDK Specifications

ADS7041EVM-PDK FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Demonstration Kits

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 1.8 V to 3.6 V

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is SPI.

  • A: What is the For Use With of the product?

    Q: The For Use With of the product is ADS7041.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Data Conversion IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top