ADS7845EVM-PDK

Mfr. #: ADS7845EVM-PDK
メーカー: Texas Instruments
説明: Display Development Tools ADS7845-PDK Eval Mod
ライフサイクル: メーカー新製品
データシート: ADS7845EVM-PDK データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS7845EVM-PDK Overview

This product is manufactured by Texas Instruments. Evaluation Boards Interface Type: I2C, SPI Texas Instruments is a trusted brand for quality electronics Display Development Tools product type 1 of 100 Development Tools as subcategory

ADS7845EVM-PDK Image

ADS7845EVM-PDK

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS7845EVM-PDK Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Display Development Tools
  • RoHS: N/A
  • Product: Evaluation Boards
  • Tool Is For Evaluation Of: ADS7845
  • Interface Type: I2C, SPI
  • Series: ADS7845
  • Brand: Texas Instruments
  • Product Type: Display Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADS7845EVM-PDK

ADS7845EVM-PDK Specifications

ADS7845EVM-PDK FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is I2C, SPI.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Display Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top