ADS8861EVM-PDK

Mfr. #: ADS8861EVM-PDK
メーカー: Texas Instruments
説明: Data Conversion IC Development Tools ADS8861 Performance Demo Kit
ライフサイクル: メーカー新製品
データシート: ADS8861EVM-PDK データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS8861EVM-PDK Overview

This product is manufactured by Texas Instruments. Demonstration Kits This device belongs to the ADC type. Texas Instruments is a trusted brand for quality electronics Interface Type: SPI Compatible with ADS8861. Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADS8861EVM-PDK Image

ADS8861EVM-PDK

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS8861EVM-PDK Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: Y
  • Product: Demonstration Kits
  • Type: ADC
  • Tool Is For Evaluation Of: ADS8861
  • Description/Function: Includes input and reference drivers
  • Series: ADS8861
  • Brand: Texas Instruments
  • Interface Type: SPI
  • For Use With: ADS8861
  • Operating Supply Current: 5 V
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADS8861EVM-PDK

ADS8861EVM-PDK Specifications

ADS8861EVM-PDK FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Demonstration Kits.

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is SPI.

  • A: At what frequency does the For Use With?

    Q: The product For Use With is ADS8861.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Data Conversion IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top