BQ20Z655EVM

Mfr. #: BQ20Z655EVM
メーカー: Texas Instruments
説明: Power Management IC Development Tools Track Tech Enabled EVM
ライフサイクル: メーカー新製品
データシート: BQ20Z655EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ20Z655EVM Overview

This product is manufactured by Texas Instruments. Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

BQ20Z655EVM Image

BQ20Z655EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ20Z655EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: E
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

BQ20Z655EVM

BQ20Z655EVM Specifications

BQ20Z655EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top