BQ25601EVM-877

Mfr. #: BQ25601EVM-877
メーカー: Texas Instruments
説明: Power Management IC Development Tools BQ25600EVM-771
ライフサイクル: メーカー新製品
データシート: BQ25601EVM-877 データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ25601EVM-877 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Battery Management type. 3.9 V to 13.5 V Input Voltage Output Voltage is 4.208 V Output current: 3 A Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, USB Compatible with EV2300/EV2400 interface board. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

BQ25601EVM-877 Image

BQ25601EVM-877

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ25601EVM-877 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Battery Management
  • Tool Is For Evaluation Of: bq25601
  • Input Voltage: 3.9 V to 13.5 V
  • Output Voltage: 4.208 V
  • Description/Function: Complete charger module for bq25601 device
  • Output Current: 3 A
  • Series: BQ25601
  • Brand: Texas Instruments
  • Interface Type: I2C, USB
  • For Use With: EV2300/EV2400 interface board
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

BQ25601EVM-877

BQ25601EVM-877 Specifications

BQ25601EVM-877 FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Battery Management.

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 3.9 V to 13.5 V

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 4.208 V.

  • A: What is the Output Current of the product?

    Q: The Output Current of the product is 3 A.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is I2C, USB.

  • A: What is the For Use With of the product?

    Q: The For Use With of the product is EV2300/EV2400 interface board.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top