| Mfr. #: | BQ25970EVM-893 |
|---|---|
| メーカー: | Texas Instruments |
| 説明: | Power Management IC Development Tools BQ25970EVM-893 |
| ライフサイクル: | メーカー新製品 |
| データシート: | BQ25970EVM-893 データシート |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Battery Management type. 12 V Input Voltage Output Voltage is 3 V to 6 V Output current: 8 A Texas Instruments is a trusted brand for quality electronics The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ25970EVM-893 Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Modules
A: At what frequency does the Type?
Q: The product Type is Battery Management.
A: Is the cutoff frequency of the product Input Voltage?
Q: Yes, the product's Input Voltage is indeed 12 V
A: At what frequency does the Output Voltage?
Q: The product Output Voltage is 3 V to 6 V.
A: What is the Output Current of the product?
Q: The Output Current of the product is 8 A.
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: At what frequency does the Maximum Operating Temperature?
Q: The product Maximum Operating Temperature is + 85 C.
A: What is the Minimum Operating Temperature of the product?
Q: The Minimum Operating Temperature of the product is - 40 C.
A: At what frequency does the Product Type?
Q: The product Product Type is Power Management IC Development Tools.
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: Is the cutoff frequency of the product Subcategory?
Q: Yes, the product's Subcategory is indeed Development Tools