BQ27545EVM

Mfr. #: BQ27545EVM
メーカー: Texas Instruments
説明: Power Management IC Development Tools Bq27545EVM
ライフサイクル: メーカー新製品
データシート: BQ27545EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ27545EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Battery Management type. 3.6 V Input Voltage Output Voltage is 2.5 V Output current: 1 A Texas Instruments is a trusted brand for quality electronics Interface Type: I2C The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

BQ27545EVM Image

BQ27545EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ27545EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Battery Management
  • Tool Is For Evaluation Of: BQ27545
  • Input Voltage: 3.6 V
  • Output Voltage: 2.5 V
  • Output Current: 1 A
  • Series: BQ27545
  • Brand: Texas Instruments
  • Interface Type: I2C
  • Maximum Operating Temperature: + 85 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

BQ27545EVM

BQ27545EVM Specifications

BQ27545EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Battery Management

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 3.6 V.

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 2.5 V.

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 1 A.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is I2C.

  • A: At what frequency does the Maximum Operating Temperature?

    Q: The product Maximum Operating Temperature is + 85 C.

  • A: At what frequency does the Minimum Operating Temperature?

    Q: The product Minimum Operating Temperature is - 40 C.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top