BQ28550-R1EVM

Mfr. #: BQ28550-R1EVM
メーカー: Texas Instruments
説明: Power Management IC Development Tools BQ28550-R1 EVAL MOD
ライフサイクル: メーカー新製品
データシート: BQ28550-R1EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ28550-R1EVM Overview

This product is manufactured by Texas Instruments. Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

BQ28550-R1EVM Image

BQ28550-R1EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ28550-R1EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

BQ28550-R1EVM

BQ28550-R1EVM Specifications

BQ28550-R1EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top