DAC121C085EVM

Mfr. #: DAC121C085EVM
メーカー: Texas Instruments
説明: Data Conversion IC Development Tools DAC121C085EVM
ライフサイクル: メーカー新製品
データシート: DAC121C085EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC121C085EVM Overview

This product is manufactured by Texas Instruments. Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.012887 oz of Unit Weight

DAC121C085EVM Image

DAC121C085EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC121C085EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Packaging: Bulk
  • Series: DAC121C085
  • Brand: Texas Instruments
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.012887 oz

DAC121C085EVM

DAC121C085EVM Specifications

DAC121C085EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Data Conversion IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.012887 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top