DAC70508EVM

Mfr. #: DAC70508EVM
メーカー: Texas Instruments
説明: Data Conversion IC Development Tools DAC80508EVM
ライフサイクル: メーカー新製品
データシート: DAC70508EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC70508EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the DAC type. 2.7 V to 5.5 V operating supply voltage range Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics Interface Type: SPI Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

DAC70508EVM Image

DAC70508EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC70508EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Boards
  • Type: DAC
  • Tool Is For Evaluation Of: DAC70508EVM
  • Operating Supply Voltage: 2.7 V to 5.5 V
  • Packaging: Bulk
  • Description/Function: Voltage Output DAC with Internal Reference
  • Series: DAC70508
  • Brand: Texas Instruments
  • Interface Type: SPI
  • Operating Supply Current: 20 mA
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

DAC70508EVM

DAC70508EVM Specifications

DAC70508EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed DAC

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 2.7 V to 5.5 V.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is SPI.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Data Conversion IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top