DAC8550EVM

Mfr. #: DAC8550EVM
メーカー: Texas Instruments
説明: Data Conversion IC Development Tools DAC CONVERTER
ライフサイクル: メーカー新製品
データシート: DAC8550EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC8550EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the DAC type. 3.3 V to 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: SPI Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

DAC8550EVM Image

DAC8550EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC8550EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N
  • Product: Evaluation Boards
  • Type: DAC
  • Tool Is For Evaluation Of: DAC8550
  • Operating Supply Voltage: 3.3 V to 5 V
  • Series: DAC8550
  • Brand: Texas Instruments
  • Interface Type: SPI
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

DAC8550EVM

DAC8550EVM Specifications

DAC8550EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: What is the Type of the product?

    Q: The Type of the product is DAC.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 3.3 V to 5 V.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is SPI.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Data Conversion IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top