DRV612EVM

Mfr. #: DRV612EVM
メーカー: Texas Instruments
説明: Audio IC Development Tools DRV612EVM
ライフサイクル: メーカー新製品
データシート: DRV612EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV612EVM Overview

This product is manufactured by Texas Instruments. 3.3 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

DRV612EVM Image

DRV612EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV612EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: N/A
  • Tool Is For Evaluation Of: DRV612
  • Operating Supply Voltage: 3.3 V
  • Series: DRV612
  • Brand: Texas Instruments
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

DRV612EVM

DRV612EVM Specifications

DRV612EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 3.3 V.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Audio IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top