| Mfr. #: | DRV8844EVM |
|---|---|
| メーカー: | Texas Instruments |
| 説明: | Power Management IC Development Tools DRV8844 Eval Mod |
| ライフサイクル: | メーカー新製品 |
| データシート: | DRV8844EVM データシート |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Power Management Specialized type. 8 V to 60 V Input Voltage Output current: 3.5 A Texas Instruments is a trusted brand for quality electronics Interface Type: USB Compatible with DRV8844. The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8844EVM Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Modules
A: At what frequency does the Type?
Q: The product Type is Power Management Specialized.
A: At what frequency does the Input Voltage?
Q: The product Input Voltage is 8 V to 60 V.
A: Is the cutoff frequency of the product Output Current?
Q: Yes, the product's Output Current is indeed 3.5 A
A: Is the cutoff frequency of the product Brand?
Q: Yes, the product's Brand is indeed Texas Instruments
A: At what frequency does the Interface Type?
Q: The product Interface Type is USB.
A: At what frequency does the For Use With?
Q: The product For Use With is DRV8844.
A: What is the Maximum Operating Temperature of the product?
Q: The Maximum Operating Temperature of the product is + 85 C.
A: Is the cutoff frequency of the product Minimum Operating Temperature?
Q: Yes, the product's Minimum Operating Temperature is indeed - 40 C
A: At what frequency does the Product Type?
Q: The product Product Type is Power Management IC Development Tools.
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: At what frequency does the Subcategory?
Q: The product Subcategory is Development Tools.