HALL-ADAPTER-EVM

Mfr. #: HALL-ADAPTER-EVM
メーカー: Texas Instruments
説明: Magnetic Sensor Development Tools HALL SENSOR EVM BOARD DRV50XX
ライフサイクル: メーカー新製品
データシート: HALL-ADAPTER-EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
HALL-ADAPTER-EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Hall Effect Sensor type. 1.65 V to 5.5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Magnetic Sensor Development Tools product type 1 of 100 Development Tools as subcategory

HALL-ADAPTER-EVM Image

HALL-ADAPTER-EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

HALL-ADAPTER-EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Magnetic Sensor Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Hall Effect Sensor
  • Tool Is For Evaluation Of: DRV5011, DRV5013, DRV5023, DRV5032, DRV5033, DRV5053, DRV5055-Q1
  • Operating Supply Voltage: 1.65 V to 5.5 V
  • Brand: Texas Instruments
  • Product Type: Magnetic Sensor Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

HALL-ADAPTER-EVM

HALL-ADAPTER-EVM Specifications

HALL-ADAPTER-EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Hall Effect Sensor.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 1.65 V to 5.5 V.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Magnetic Sensor Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top