INA180-181EVM

Mfr. #: INA180-181EVM
メーカー: Texas Instruments
説明: Multiple Function Sensor Development Tools INA180-181EVM
ライフサイクル: メーカー新製品
データシート: INA180-181EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
INA180-181EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules 2.7 V to 5.5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Multiple Function Sensor Development Tools product type 1 of 100 Development Tools as subcategory

INA180-181EVM Image

INA180-181EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

INA180-181EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Multiple Function Sensor Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Tool Is For Evaluation Of: INA180, INA181
  • Operating Supply Voltage: 2.7 V to 5.5 V
  • Description/Function: Evaluates the INA180 and INA181 voltage output current-shunt monitors
  • Series: INA180/181
  • Brand: Texas Instruments
  • Product Type: Multiple Function Sensor Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

INA180-181EVM

INA180-181EVM Specifications

INA180-181EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 2.7 V to 5.5 V

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Multiple Function Sensor Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top