INA219EVM

Mfr. #: INA219EVM
メーカー: Texas Instruments
説明: Power Management IC Development Tools INA219EVM Eval Mod
ライフサイクル: メーカー新製品
データシート: INA219EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
INA219EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Current Monitors & Regulators type. 6 V Input Voltage Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, SPI, USB Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

INA219EVM Image

INA219EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

INA219EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: E
  • Product: Evaluation Modules
  • Type: Current Monitors & Regulators
  • Tool Is For Evaluation Of: INA219
  • Input Voltage: 6 V
  • Description/Function: The INA219EVM is an evaluation module that is used to fully evaluate the INA219 current/power monitor device
  • Series: INA219
  • Brand: Texas Instruments
  • Interface Type: I2C, SPI, USB
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

INA219EVM

INA219EVM Specifications

INA219EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Current Monitors & Regulators.

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 6 V

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed I2C, SPI, USB

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top