LM5145EVM-HD-20A

Mfr. #: LM5145EVM-HD-20A
メーカー: Texas Instruments
説明: Power Management IC Development Tools LM5145 HIGH DENSITY 20A EVM
ライフサイクル: メーカー新製品
データシート: LM5145EVM-HD-20A データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LM5145EVM-HD-20A Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Switching Controllers type. 24 V to 72 V Input Voltage Output Voltage is 5 V Dimensions of 50 mm x 30 mm Output current: 20 A Texas Instruments is a trusted brand for quality electronics The product can operate at a maximum temperature of + 125 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.250795 oz of Unit Weight

LM5145EVM-HD-20A Image

LM5145EVM-HD-20A

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LM5145EVM-HD-20A Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Switching Controllers
  • Tool Is For Evaluation Of: LM5145
  • Input Voltage: 24 V to 72 V
  • Output Voltage: 5 V
  • Description/Function: Evaluates the LM5145 synchronous buck controller
  • Dimensions: 50 mm x 30 mm
  • Output Current: 20 A
  • Series: LM5145
  • Brand: Texas Instruments
  • Maximum Operating Temperature: + 125 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.250795 oz

LM5145EVM-HD-20A

LM5145EVM-HD-20A Specifications

LM5145EVM-HD-20A FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Switching Controllers.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 24 V to 72 V.

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 5 V.

  • A: What is the Dimensions of the product?

    Q: The Dimensions of the product is 50 mm x 30 mm.

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 20 A

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Maximum Operating Temperature of the product?

    Q: The Maximum Operating Temperature of the product is + 125 C.

  • A: At what frequency does the Minimum Operating Temperature?

    Q: The product Minimum Operating Temperature is - 40 C.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.250795 oz.

13 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top