LM8365EVM

Mfr. #: LM8365EVM
メーカー: Texas Instruments
説明: Power Management IC Development Tools LM8365EVM
ライフサイクル: メーカー新製品
データシート: LM8365EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LM8365EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Supervisory Circuits type. 1 V to 6 V Input Voltage Dimensions of 1.5 in x 1.15 in Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 1.740 lbs of Unit Weight

LM8365EVM Image

LM8365EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LM8365EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Supervisory Circuits
  • Tool Is For Evaluation Of: LM8365
  • Input Voltage: 1 V to 6 V
  • Description/Function: Micropower undervoltage supervisor evaluation module
  • Dimensions: 1.5 in x 1.15 in
  • Series: LM8365
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 1.740 lbs

LM8365EVM

LM8365EVM Specifications

LM8365EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Supervisory Circuits.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 1 V to 6 V.

  • A: Is the cutoff frequency of the product Dimensions?

    Q: Yes, the product's Dimensions is indeed 1.5 in x 1.15 in

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 1.740 lbs.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top