LMZ20501EVM

Mfr. #: LMZ20501EVM
メーカー: Texas Instruments
説明: Power Management IC Development Tools LMZ20501 EVAL MOD
ライフサイクル: メーカー新製品
データシート: LMZ20501EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LMZ20501EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the AC/DC Converters type. 2.7 V to 5.5 V Input Voltage Output Voltage is 1.8 V Dimensions of 64 mm x 27 mm Output current: 1 A Texas Instruments is a trusted brand for quality electronics Compatible with LMZ20501. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory The product's SIMPLE SWITCHER is Blue Gecko. 1. 0.022743 oz of Unit Weight

LMZ20501EVM Image

LMZ20501EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LMZ20501EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Boards
  • Type: AC/DC Converters
  • Tool Is For Evaluation Of: LMZ20501
  • Input Voltage: 2.7 V to 5.5 V
  • Output Voltage: 1.8 V
  • Dimensions: 64 mm x 27 mm
  • Output Current: 1 A
  • Series: LMZ20501
  • Brand: Texas Instruments
  • For Use With: LMZ20501
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Tradename: SIMPLE SWITCHER
  • Unit Weight: 0.022743 oz

LMZ20501EVM

LMZ20501EVM Specifications

LMZ20501EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is AC/DC Converters.

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 2.7 V to 5.5 V

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 1.8 V.

  • A: Is the cutoff frequency of the product Dimensions?

    Q: Yes, the product's Dimensions is indeed 64 mm x 27 mm

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 1 A

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the For Use With?

    Q: The product For Use With is LMZ20501.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: What is the Tradename of the product?

    Q: The Tradename of the product is SIMPLE SWITCHER.

  • A: Is the cutoff frequency of the product Unit Weight?

    Q: Yes, the product's Unit Weight is indeed 0.022743 oz

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top