LMZ20502EVM

Mfr. #: LMZ20502EVM
メーカー: Texas Instruments
説明: Power Management IC Development Tools LMZ20502 EVAL MOD
ライフサイクル: メーカー新製品
データシート: LMZ20502EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LMZ20502EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the AC/DC Converters type. 2.7 V to 5.5 V Input Voltage Output Voltage is 1.8 V Dimensions of 64 mm x 27 mm Output current: 2 A Texas Instruments is a trusted brand for quality electronics Compatible with LMZ20502. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory The product's SIMPLE SWITCHER is Blue Gecko. 1. 0.022743 oz of Unit Weight

LMZ20502EVM Image

LMZ20502EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LMZ20502EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Boards
  • Type: AC/DC Converters
  • Tool Is For Evaluation Of: LMZ20502
  • Input Voltage: 2.7 V to 5.5 V
  • Output Voltage: 1.8 V
  • Dimensions: 64 mm x 27 mm
  • Output Current: 2 A
  • Series: LMZ20502
  • Brand: Texas Instruments
  • For Use With: LMZ20502
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Tradename: SIMPLE SWITCHER
  • Unit Weight: 0.022743 oz

LMZ20502EVM

LMZ20502EVM Specifications

LMZ20502EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is AC/DC Converters.

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 2.7 V to 5.5 V

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 1.8 V

  • A: What is the Dimensions of the product?

    Q: The Dimensions of the product is 64 mm x 27 mm.

  • A: What is the Output Current of the product?

    Q: The Output Current of the product is 2 A.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the For Use With?

    Q: The product For Use With is LMZ20502.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: What is the Tradename of the product?

    Q: The Tradename of the product is SIMPLE SWITCHER.

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.022743 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top