| Mfr. #: | MCIMX7D5EVM10SC |
|---|---|
| メーカー: | NXP Semiconductors |
| 説明: | Processors - Application Specialized i.MX 7Dual: 2x Cortex A7, 2x USB 2.0 OTG&PHY,PCIe, 2xSDIO/MMC,CAN, 2x Ethernet, Security,Ext.Temp |
| ライフサイクル: | メーカー新製品 |
| データシート: | MCIMX7D5EVM10SC データシート |


This product is manufactured by NXP. The product can operate at a maximum temperature of SMD/SMT. BGA-541 package/case type is utilized by this product. The Consumer Applications for this product. This product's ARM Cortex A7, ARM Cortex M4 is an ARM Cortex M3. This product has a Data Bus Width of 32 bit. The Maximum Clock Frequency of this product is 1 GHz. 1.2 V to 1.25 V operating supply voltage range The minimum operating temperature of this product is - 20 C. The product can operate at a maximum temperature of + 105 C. Tray packaging for easy dispensing This product features DDR3, DDR3L, LPDDR2, LPDDR3 memory type for improved performance and speed. NXP Semiconductors is a trusted brand for quality electronics The Data RAM Size of this product is 256 kB. The Data ROM Size is 96 kB. Interface Type: I2C, JTAG, PCI, SAI, UART Floating Point instruction type supported. Yes regarding Moisture Sensitivity Processors - Application Specialized product type 84 of 100 Processors - Application Specialized as subcategory The product's i.MX is Blue Gecko. This product is also known by the 935325059557 number of 934069005115. 1. 0 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

MCIMX7D5EVM10SC Specifications
A: Is the cutoff frequency of the product Manufacturer?
Q: Yes, the product's Manufacturer is indeed NXP
A: At what frequency does the Mounting Style?
Q: The product Mounting Style is SMD/SMT.
A: At what frequency does the Package / Case?
Q: The product Package / Case is BGA-541.
A: Is the cutoff frequency of the product Application?
Q: Yes, the product's Application is indeed Consumer Applications
A: At what frequency does the Core?
Q: The product Core is ARM Cortex A7, ARM Cortex M4.
A: Is the cutoff frequency of the product Data Bus Width?
Q: Yes, the product's Data Bus Width is indeed 32 bit
A: Is the cutoff frequency of the product Maximum Clock Frequency?
Q: Yes, the product's Maximum Clock Frequency is indeed 1 GHz
A: What is the Operating Supply Voltage of the product?
Q: The Operating Supply Voltage of the product is 1.2 V to 1.25 V.
A: Is the cutoff frequency of the product Minimum Operating Temperature?
Q: Yes, the product's Minimum Operating Temperature is indeed - 20 C
A: At what frequency does the Maximum Operating Temperature?
Q: The product Maximum Operating Temperature is + 105 C.
A: Is the cutoff frequency of the product Packaging?
Q: Yes, the product's Packaging is indeed Tray
A: At what frequency does the Memory Type?
Q: The product Memory Type is DDR3, DDR3L, LPDDR2, LPDDR3.
A: What is the Brand of the product?
Q: The Brand of the product is NXP Semiconductors.
A: What is the Data RAM Size of the product?
Q: The Data RAM Size of the product is 256 kB.
A: Is the cutoff frequency of the product Data ROM Size?
Q: Yes, the product's Data ROM Size is indeed 96 kB
A: At what frequency does the Interface Type?
Q: The product Interface Type is I2C, JTAG, PCI, SAI, UART.
A: What is the Instruction Type of the product?
Q: The Instruction Type of the product is Floating Point.
A: At what frequency does the Moisture Sensitive?
Q: The product Moisture Sensitive is Yes.
A: At what frequency does the Product Type?
Q: The product Product Type is Processors - Application Specialized.
A: Is the cutoff frequency of the product Factory Pack Quantity?
Q: Yes, the product's Factory Pack Quantity is indeed 84
A: Is the cutoff frequency of the product Subcategory?
Q: Yes, the product's Subcategory is indeed Processors - Application Specialized
A: What is the Tradename of the product?
Q: The Tradename of the product is i.MX.
A: What is the Part # Aliases of the product?
Q: The Part # Aliases of the product is 935325059557.
A: Is the cutoff frequency of the product Unit Weight?
Q: Yes, the product's Unit Weight is indeed 0 oz