PP-SALB-EVM

Mfr. #: PP-SALB-EVM
メーカー: Texas Instruments
説明: Audio IC Development Tools PP-SALB-EVM
ライフサイクル: メーカー新製品
データシート: PP-SALB-EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
PP-SALB-EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Audio Amplifier type. 8 V to 26 V operating supply voltage range Output power: 30 W Texas Instruments is a trusted brand for quality electronics Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

PP-SALB-EVM Image

PP-SALB-EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

PP-SALB-EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Audio Amplifier
  • Tool Is For Evaluation Of: AMC1200, PCM3070, TAS1020B, TPA3118D2
  • Operating Supply Voltage: 8 V to 26 V
  • Output Power: 30 W
  • Brand: Texas Instruments
  • Operating Supply Current: 8 A
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

PP-SALB-EVM

PP-SALB-EVM Specifications

PP-SALB-EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Audio Amplifier.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 8 V to 26 V

  • A: At what frequency does the Output Power?

    Q: The product Output Power is 30 W.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Audio IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top