TAS5162DDV6EVM2

Mfr. #: TAS5162DDV6EVM2
メーカー: Texas Instruments
説明: Audio IC Development Tools TAS5162DDV6 Eval Mod
ライフサイクル: メーカー新製品
データシート: TAS5162DDV6EVM2 データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TAS5162DDV6EVM2 Overview

This product is manufactured by Texas Instruments. This device belongs to the Audio Amplifier type. Texas Instruments is a trusted brand for quality electronics Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

TAS5162DDV6EVM2 Image

TAS5162DDV6EVM2

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TAS5162DDV6EVM2 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: E
  • Type: Audio Amplifier
  • Tool Is For Evaluation Of: TAS5518, TAS5162
  • Brand: Texas Instruments
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TAS5162DDV6EVM2

TAS5162DDV6EVM2 Specifications

TAS5162DDV6EVM2 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Type?

    Q: The product Type is Audio Amplifier.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Audio IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top