TAS5715EVM

Mfr. #: TAS5715EVM
メーカー: Texas Instruments
説明: Audio IC Development Tools TAS5715EVM Eval Mod
ライフサイクル: メーカー新製品
データシート: TAS5715EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TAS5715EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Audio Amplifier type. 3.3 V operating supply voltage range Output power: 25 W Texas Instruments is a trusted brand for quality electronics Interface Type: USB Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

TAS5715EVM Image

TAS5715EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TAS5715EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: E
  • Product: Evaluation Modules
  • Type: Audio Amplifier
  • Tool Is For Evaluation Of: TAS5715PHP
  • Operating Supply Voltage: 3.3 V
  • Output Power: 25 W
  • Series: TAS5715
  • Brand: Texas Instruments
  • Interface Type: USB
  • Operating Supply Current: 56 mA
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TAS5715EVM

TAS5715EVM Specifications

TAS5715EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Audio Amplifier.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 3.3 V.

  • A: Is the cutoff frequency of the product Output Power?

    Q: Yes, the product's Output Power is indeed 25 W

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is USB.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Audio IC Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top