THS6022EVM

Mfr. #: THS6022EVM
メーカー: Texas Instruments
説明: Amplifier IC Development Tools THS6022 Hi-Spd Amp Eval Mods
ライフサイクル: メーカー新製品
データシート: THS6022EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
THS6022EVM Overview

This product is manufactured by Texas Instruments. Texas Instruments is a trusted brand for quality electronics Amplifier IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 2.205 lbs of Unit Weight

THS6022EVM Image

THS6022EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

THS6022EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Amplifier IC Development Tools
  • RoHS: N
  • Brand: Texas Instruments
  • Product Type: Amplifier IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 2.205 lbs

THS6022EVM

THS6022EVM Specifications

THS6022EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Amplifier IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 2.205 lbs.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top