TMP108EVM

Mfr. #: TMP108EVM
メーカー: Texas Instruments
説明: Temperature Sensor Development Tools TMP108 EVAL MOD
ライフサイクル: メーカー新製品
データシート: TMP108EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TMP108EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards 1.8 V, 3.3 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, USB The product can operate at a maximum temperature of + 125 C. The minimum operating temperature of this product is - 40 C. Temperature Sensor Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.024355 oz of Unit Weight

TMP108EVM Image

TMP108EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP108EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Temperature Sensor Development Tools
  • RoHS: Y
  • Product: Evaluation Boards
  • Tool Is For Evaluation Of: TMP108
  • Operating Supply Voltage: 1.8 V, 3.3 V
  • Series: TMP108
  • Brand: Texas Instruments
  • Interface Type: I2C, USB
  • Maximum Operating Temperature: + 125 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Temperature Sensor Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.024355 oz

TMP108EVM

TMP108EVM Specifications

TMP108EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 1.8 V, 3.3 V

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed I2C, USB

  • A: Is the cutoff frequency of the product Maximum Operating Temperature?

    Q: Yes, the product's Maximum Operating Temperature is indeed + 125 C

  • A: What is the Minimum Operating Temperature of the product?

    Q: The Minimum Operating Temperature of the product is - 40 C.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Temperature Sensor Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.024355 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top