TMP122EVM

Mfr. #: TMP122EVM
メーカー: Texas Instruments
説明: Temperature Sensor Development Tools TMP122 Eval Mod
ライフサイクル: メーカー新製品
データシート: TMP122EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TMP122EVM Overview

This product is manufactured by Texas Instruments. Texas Instruments is a trusted brand for quality electronics Temperature Sensor Development Tools product type 1 of 100 Development Tools as subcategory

TMP122EVM Image

TMP122EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP122EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Temperature Sensor Development Tools
  • RoHS: N
  • Brand: Texas Instruments
  • Product Type: Temperature Sensor Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TMP122EVM

TMP122EVM Specifications

TMP122EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Temperature Sensor Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top