TPA3123D2EVM

Mfr. #: TPA3123D2EVM
メーカー: Texas Instruments
説明: Audio IC Development Tools TPA3123D2EVM Eval Mod
ライフサイクル: メーカー新製品
データシート: TPA3123D2EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPA3123D2EVM Overview

This product is manufactured by Texas Instruments. This device belongs to the Audio Amplifier type. 10 V to 30 V operating supply voltage range Output power: 24 W Texas Instruments is a trusted brand for quality electronics Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

TPA3123D2EVM Image

TPA3123D2EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPA3123D2EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: E
  • Type: Audio Amplifier
  • Tool Is For Evaluation Of: TPA3123D2
  • Operating Supply Voltage: 10 V to 30 V
  • Output Power: 24 W
  • Series: TPA3123D2
  • Brand: Texas Instruments
  • Operating Supply Current: 2 A
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPA3123D2EVM

TPA3123D2EVM Specifications

TPA3123D2EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Type?

    Q: The product Type is Audio Amplifier.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 10 V to 30 V.

  • A: At what frequency does the Output Power?

    Q: The product Output Power is 24 W.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Audio IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top