TPA3132D2EVM

Mfr. #: TPA3132D2EVM
メーカー: Texas Instruments
説明: Audio IC Development Tools TPA3132D2 EVAL MOD
ライフサイクル: メーカー新製品
データシート: TPA3132D2EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPA3132D2EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Audio Amplifier type. 26 V operating supply voltage range Bulk packaging for easy dispensing Output power: 25 W Texas Instruments is a trusted brand for quality electronics Compatible with TPA3132D2. Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

TPA3132D2EVM Image

TPA3132D2EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPA3132D2EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Audio Amplifier
  • Tool Is For Evaluation Of: TPA3132D2
  • Operating Supply Voltage: 26 V
  • Packaging: Bulk
  • Description/Function: Evaluation module for 25W class-D speaker amplifier
  • Output Power: 25 W
  • Series: TPA3132D2
  • Brand: Texas Instruments
  • For Use With: TPA3132D2
  • Operating Supply Current: 3 A
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPA3132D2EVM

TPA3132D2EVM Specifications

TPA3132D2EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Audio Amplifier.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 26 V

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: Is the cutoff frequency of the product Output Power?

    Q: Yes, the product's Output Power is indeed 25 W

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the For Use With of the product?

    Q: The For Use With of the product is TPA3132D2.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Audio IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top