TPS2071EVM-159

Mfr. #: TPS2071EVM-159
メーカー: Texas Instruments
説明: Power Management IC Development Tools TPS2071-159 Eval Mod
ライフサイクル: メーカー新製品
データシート: TPS2071EVM-159 データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS2071EVM-159 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Power Distributions type. 4.75 V to 5.25 V, 4.85 V to 5.15 V Input Voltage Output Voltage is 5 V Output current: 2 A Texas Instruments is a trusted brand for quality electronics Interface Type: USB Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS2071EVM-159 Image

TPS2071EVM-159

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2071EVM-159 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Power Distributions
  • Tool Is For Evaluation Of: TPS2071
  • Input Voltage: 4.75 V to 5.25 V, 4.85 V to 5.15 V
  • Output Voltage: 5 V
  • Description/Function: TPS2071 hybrid USB hub evaluation module
  • Output Current: 2 A
  • Series: TPS2071
  • Brand: Texas Instruments
  • Interface Type: USB
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS2071EVM-159

TPS2071EVM-159 Specifications

TPS2071EVM-159 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Power Distributions.

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 4.75 V to 5.25 V, 4.85 V to 5.15 V

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 5 V.

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 2 A

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed USB

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top