| Mfr. #: | TPS22968Q1EVM |
|---|---|
| メーカー: | Texas Instruments |
| 説明: | Power Management IC Development Tools TPS22968-Q1 Eval Module |
| ライフサイクル: | メーカー新製品 |
| データシート: | TPS22968Q1EVM データシート |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Load Switches type. 800 mV to 5.5 V Input Voltage The AEC-Q100 Qualification Bulk packaging for easy dispensing Output current: 4 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.065299 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS22968Q1EVM Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Modules
A: At what frequency does the Type?
Q: The product Type is Load Switches.
A: What is the Input Voltage of the product?
Q: The Input Voltage of the product is 800 mV to 5.5 V.
A: At what frequency does the Qualification?
Q: The product Qualification is AEC-Q100.
A: At what frequency does the Packaging?
Q: The product Packaging is Bulk.
A: What is the Output Current of the product?
Q: The Output Current of the product is 4 A.
A: Is the cutoff frequency of the product Brand?
Q: Yes, the product's Brand is indeed Texas Instruments
A: Is the cutoff frequency of the product Product Type?
Q: Yes, the product's Product Type is indeed Power Management IC Development Tools
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.
A: What is the Unit Weight of the product?
Q: The Unit Weight of the product is 0.065299 oz.