TPS22975EVM

Mfr. #: TPS22975EVM
メーカー: Texas Instruments
説明: Power Management IC Development Tools EVALUATION MODULE FOR THE TPS22975
ライフサイクル: メーカー新製品
データシート: TPS22975EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS22975EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Load Switches type. 0.6 V to 5.7 V Input Voltage Output Voltage is - Texas Instruments is a trusted brand for quality electronics Compatible with TPS22975. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS22975EVM Image

TPS22975EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS22975EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Load Switches
  • Tool Is For Evaluation Of: TPS22975
  • Input Voltage: 0.6 V to 5.7 V
  • Output Voltage: -
  • Description/Function: Load switch evaluation module
  • Series: TPS22975
  • Brand: Texas Instruments
  • For Use With: TPS22975
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS22975EVM

TPS22975EVM Specifications

TPS22975EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Load Switches.

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 0.6 V to 5.7 V

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is -.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed TPS22975

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top