| Mfr. #: | TPS23752EVM-145 |
|---|---|
| メーカー: | Texas Instruments |
| 説明: | Power Management IC Development Tools TPS23752 Eval Mod |
| ライフサイクル: | メーカー新製品 |
| データシート: | TPS23752EVM-145 データシート |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Power Over Ethernet type. 0 V to 57 V Input Voltage Output Voltage is 5 V Output current: 5 A Texas Instruments is a trusted brand for quality electronics Compatible with TPS23752. The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.509254 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS23752EVM-145 Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Modules
A: At what frequency does the Type?
Q: The product Type is Power Over Ethernet.
A: Is the cutoff frequency of the product Input Voltage?
Q: Yes, the product's Input Voltage is indeed 0 V to 57 V
A: What is the Output Voltage of the product?
Q: The Output Voltage of the product is 5 V.
A: At what frequency does the Output Current?
Q: The product Output Current is 5 A.
A: Is the cutoff frequency of the product Brand?
Q: Yes, the product's Brand is indeed Texas Instruments
A: Is the cutoff frequency of the product For Use With?
Q: Yes, the product's For Use With is indeed TPS23752
A: At what frequency does the Maximum Operating Temperature?
Q: The product Maximum Operating Temperature is + 85 C.
A: What is the Minimum Operating Temperature of the product?
Q: The Minimum Operating Temperature of the product is - 40 C.
A: At what frequency does the Product Type?
Q: The product Product Type is Power Management IC Development Tools.
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.
A: What is the Unit Weight of the product?
Q: The Unit Weight of the product is 0.509254 oz.