TPS2544EVM-064

Mfr. #: TPS2544EVM-064
メーカー: Texas Instruments
説明: Power Management IC Development Tools TPS2544 EVAL MOD
ライフサイクル: メーカー新製品
データシート: TPS2544EVM-064 データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS2544EVM-064 Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Load Switches type. Texas Instruments is a trusted brand for quality electronics Compatible with TPS2544. The product can operate at a maximum temperature of + 125 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS2544EVM-064 Image

TPS2544EVM-064

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2544EVM-064 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Boards
  • Type: Load Switches
  • Tool Is For Evaluation Of: TPS2544
  • Description/Function: USB charging port controller and power switch
  • Series: TPS2544
  • Brand: Texas Instruments
  • For Use With: TPS2544
  • Maximum Operating Temperature: + 125 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS2544EVM-064

TPS2544EVM-064 Specifications

TPS2544EVM-064 FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is Load Switches.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed TPS2544

  • A: At what frequency does the Maximum Operating Temperature?

    Q: The product Maximum Operating Temperature is + 125 C.

  • A: Is the cutoff frequency of the product Minimum Operating Temperature?

    Q: Yes, the product's Minimum Operating Temperature is indeed - 40 C

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top