TPS2H160EVM

Mfr. #: TPS2H160EVM
メーカー: Texas Instruments
説明: Power Management IC Development Tools TPS2H160EVM
ライフサイクル: メーカー新製品
データシート: TPS2H160EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS2H160EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Power Distributions type. 3.4 V to 40 V Input Voltage Output Voltage is 40 V Output current: 2.5 A Texas Instruments is a trusted brand for quality electronics The product can operate at a maximum temperature of + 150 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory The product's SIMPLE SWITCHER is Blue Gecko.

TPS2H160EVM Image

TPS2H160EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2H160EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Power Distributions
  • Tool Is For Evaluation Of: TPS2H160-Q1
  • Input Voltage: 3.4 V to 40 V
  • Output Voltage: 40 V
  • Description/Function: Evaluates the TPS2H160-Q1 integrates circuit
  • Output Current: 2.5 A
  • Series: TPS2H160
  • Brand: Texas Instruments
  • Maximum Operating Temperature: + 150 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Tradename: SIMPLE SWITCHER

TPS2H160EVM

TPS2H160EVM Specifications

TPS2H160EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Power Distributions.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 3.4 V to 40 V.

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 40 V.

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 2.5 A

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Maximum Operating Temperature of the product?

    Q: The Maximum Operating Temperature of the product is + 150 C.

  • A: At what frequency does the Minimum Operating Temperature?

    Q: The product Minimum Operating Temperature is - 40 C.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: At what frequency does the Tradename?

    Q: The product Tradename is SIMPLE SWITCHER.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top