TPS382-Q1EVM

Mfr. #: TPS382-Q1EVM
メーカー: Texas Instruments
説明: Power Management IC Development Tools EVM FOR TPS382X-XX-Q1
ライフサイクル: メーカー新製品
データシート: TPS382-Q1EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS382-Q1EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Supervisory Circuits type. 1.1 V to 5.5 V Input Voltage The AEC-Q100 Qualification Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.032740 oz of Unit Weight

TPS382-Q1EVM Image

TPS382-Q1EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS382-Q1EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Supervisory Circuits
  • Tool Is For Evaluation Of: TPS382x-Q1
  • Input Voltage: 1.1 V to 5.5 V
  • Qualification: AEC-Q100
  • Description/Function: Evaluation module for TPS382x-Q1 family of voltage supervisors
  • Series: TPS382-Q1
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.032740 oz

TPS382-Q1EVM

TPS382-Q1EVM Specifications

TPS382-Q1EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Supervisory Circuits.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 1.1 V to 5.5 V.

  • A: Is the cutoff frequency of the product Qualification?

    Q: Yes, the product's Qualification is indeed AEC-Q100

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.032740 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top