TPS40090EVM-002

Mfr. #: TPS40090EVM-002
メーカー: Texas Instruments
説明: Power Management IC Development Tools TPS40090-002 Eval Mod
ライフサイクル: メーカー新製品
データシート: TPS40090EVM-002 データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS40090EVM-002 Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Switching Controllers type. 12 V Input Voltage Output Voltage is 1.5 V Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS40090EVM-002 Image

TPS40090EVM-002

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS40090EVM-002 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Boards
  • Type: Switching Controllers
  • Tool Is For Evaluation Of: TPS40090
  • Input Voltage: 12 V
  • Output Voltage: 1.5 V
  • Series: TPS40090
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS40090EVM-002

TPS40090EVM-002 Specifications

TPS40090EVM-002 FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: At what frequency does the Type?

    Q: The product Type is Switching Controllers.

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 12 V

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 1.5 V.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top