TPS53313EVM-078

Mfr. #: TPS53313EVM-078
メーカー: Texas Instruments
説明: Power Management IC Development Tools TPS53313EVM-078
ライフサイクル: メーカー新製品
データシート: TPS53313EVM-078 データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS53313EVM-078 Overview

This product is manufactured by Texas Instruments. Evaluation Modules 8 V to 14 V Input Voltage Output Voltage is 1.2 V Output current: 6 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory The product's SWIFT is Blue Gecko. 1. 0.130664 oz of Unit Weight

TPS53313EVM-078 Image

TPS53313EVM-078

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS53313EVM-078 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: E
  • Product: Evaluation Modules
  • Tool Is For Evaluation Of: TPS53313
  • Input Voltage: 8 V to 14 V
  • Output Voltage: 1.2 V
  • Output Current: 6 A
  • Series: TPS53313
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Tradename: SWIFT
  • Unit Weight: 0.130664 oz

TPS53313EVM-078

TPS53313EVM-078 Specifications

TPS53313EVM-078 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 8 V to 14 V.

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 1.2 V.

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 6 A.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: At what frequency does the Tradename?

    Q: The product Tradename is SWIFT.

  • A: Is the cutoff frequency of the product Unit Weight?

    Q: Yes, the product's Unit Weight is indeed 0.130664 oz

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top