TPS563200EVM-652

Mfr. #: TPS563200EVM-652
メーカー: Texas Instruments
説明: Power Management IC Development Tools TPS563200 Eval Mod
ライフサイクル: メーカー新製品
データシート: TPS563200EVM-652 データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS563200EVM-652 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 4.5 V to 17 V Input Voltage Output Voltage is 1.05 V Output current: 0 A to 3 A Texas Instruments is a trusted brand for quality electronics Compatible with TPS563200. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.108527 oz of Unit Weight

TPS563200EVM-652 Image

TPS563200EVM-652

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS563200EVM-652 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: TPS563200
  • Input Voltage: 4.5 V to 17 V
  • Output Voltage: 1.05 V
  • Description/Function: TPS563200EVM-652 3 A, SWIFT regulator evaluation module
  • Output Current: 0 A to 3 A
  • Series: TPS563200
  • Brand: Texas Instruments
  • For Use With: TPS563200
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.108527 oz

TPS563200EVM-652

TPS563200EVM-652 Specifications

TPS563200EVM-652 FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Voltage Regulators - Switching Regulators.

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 4.5 V to 17 V

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 1.05 V

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 0 A to 3 A

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed TPS563200

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.108527 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top