TPS61322EVM-001

Mfr. #: TPS61322EVM-001
メーカー: Texas Instruments
説明: Power Management IC Development Tools TPS61322EVM-001
ライフサイクル: メーカー新製品
データシート: TPS61322EVM-001 データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS61322EVM-001 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 1.2 V Input Voltage Output Voltage is 2.2 V Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics Compatible with Single Buck Controller with adaptive On-Time D-CAP Mode Control. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS61322EVM-001 Image

TPS61322EVM-001

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS61322EVM-001 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: TPS61322
  • Input Voltage: 1.2 V
  • Output Voltage: 2.2 V
  • Packaging: Bulk
  • Description/Function: Synchronous Boost Converter Evaluation Module
  • Series: TPS61322DBZ
  • Brand: Texas Instruments
  • For Use With: Single Buck Controller with adaptive On-Time D-CAP Mode Control
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS61322EVM-001

TPS61322EVM-001 Specifications

TPS61322EVM-001 FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Voltage Regulators - Switching Regulators

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 1.2 V.

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 2.2 V

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the For Use With?

    Q: The product For Use With is Single Buck Controller with adaptive On-Time D-CAP Mode Control.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top