TPS62097EVM-651

Mfr. #: TPS62097EVM-651
メーカー: Texas Instruments
説明: Power Management IC Development Tools TPS62097EVM-651
ライフサイクル: メーカー新製品
データシート: TPS62097EVM-651 データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS62097EVM-651 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 2.5 V to 6 V Input Voltage Output Voltage is 1.2 V Output current: 2 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS62097EVM-651 Image

TPS62097EVM-651

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS62097EVM-651 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: TPS62097
  • Input Voltage: 2.5 V to 6 V
  • Output Voltage: 1.2 V
  • Output Current: 2 A
  • Series: TPS62097
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS62097EVM-651

TPS62097EVM-651 Specifications

TPS62097EVM-651 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Voltage Regulators - Switching Regulators.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 2.5 V to 6 V.

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 1.2 V.

  • A: What is the Output Current of the product?

    Q: The Output Current of the product is 2 A.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top