TPS65680EVM

Mfr. #: TPS65680EVM
メーカー: Texas Instruments
説明: Power Management IC Development Tools EVM FOR DEVICE TPS65680RSN
ライフサイクル: メーカー新製品
データシート: TPS65680EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS65680EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Power Supply Controllers type. 2.7 V to 5.5 V Input Voltage Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics Compatible with Large Format LCD display. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS65680EVM Image

TPS65680EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS65680EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Boards
  • Type: Power Supply Controllers
  • Tool Is For Evaluation Of: TPS65680
  • Input Voltage: 2.7 V to 5.5 V
  • Packaging: Bulk
  • Description/Function: Programmable Level Shifter
  • Series: TPS65680
  • Brand: Texas Instruments
  • For Use With: Large Format LCD display
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS65680EVM

TPS65680EVM Specifications

TPS65680EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Power Supply Controllers

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 2.7 V to 5.5 V

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed Large Format LCD display

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

14 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top