TPS65820EVM

Mfr. #: TPS65820EVM
メーカー: Texas Instruments
説明: Power Management IC Development Tools TPS65820EVM
ライフサイクル: メーカー新製品
データシート: TPS65820EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS65820EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the PMIC Solutions type. 5 V Input Voltage Dimensions of 101.6 mm x 76.2 mm Texas Instruments is a trusted brand for quality electronics The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS65820EVM Image

TPS65820EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS65820EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Boards
  • Type: PMIC Solutions
  • Tool Is For Evaluation Of: TPS65820
  • Input Voltage: 5 V
  • Dimensions: 101.6 mm x 76.2 mm
  • Series: TPS65820
  • Brand: Texas Instruments
  • Maximum Operating Temperature: + 85 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS65820EVM

TPS65820EVM Specifications

TPS65820EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: At what frequency does the Type?

    Q: The product Type is PMIC Solutions.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 5 V.

  • A: What is the Dimensions of the product?

    Q: The Dimensions of the product is 101.6 mm x 76.2 mm.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Maximum Operating Temperature?

    Q: The product Maximum Operating Temperature is + 85 C.

  • A: Is the cutoff frequency of the product Minimum Operating Temperature?

    Q: Yes, the product's Minimum Operating Temperature is indeed - 40 C

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top