TPS78230EVM-445

Mfr. #: TPS78230EVM-445
メーカー: Texas Instruments
説明: Power Management IC Development Tools TPS78230EVM-445 Eval Mod
ライフサイクル: メーカー新製品
データシート: TPS78230EVM-445 データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS78230EVM-445 Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the LDO Voltage Regulators type. 2.2 V to 5.5 V Input Voltage Output Voltage is 3 V Dimensions of 38.1 mm x 30.5 mm Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 2.205 lbs of Unit Weight

TPS78230EVM-445 Image

TPS78230EVM-445

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS78230EVM-445 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Boards
  • Type: LDO Voltage Regulators
  • Tool Is For Evaluation Of: TPS78230
  • Input Voltage: 2.2 V to 5.5 V
  • Output Voltage: 3 V
  • Dimensions: 38.1 mm x 30.5 mm
  • Series: TPS782
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 2.205 lbs

TPS78230EVM-445

TPS78230EVM-445 Specifications

TPS78230EVM-445 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed LDO Voltage Regulators

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 2.2 V to 5.5 V

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 3 V

  • A: What is the Dimensions of the product?

    Q: The Dimensions of the product is 38.1 mm x 30.5 mm.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 2.205 lbs.

23 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top