TPS7B8250EVM

Mfr. #: TPS7B8250EVM
メーカー: Texas Instruments
説明: Power Management IC Development Tools TPS7B8250EVM
ライフサイクル: メーカー新製品
データシート: TPS7B8250EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS7B8250EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the LDO Voltage Regulators type. 3 V to 40 V Input Voltage Output Voltage is 5 V Output current: 300 mA Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS7B8250EVM Image

TPS7B8250EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS7B8250EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: LDO Voltage Regulators
  • Tool Is For Evaluation Of: TPS7B82-Q1
  • Input Voltage: 3 V to 40 V
  • Output Voltage: 5 V
  • Output Current: 300 mA
  • Series: TPS7B82-Q1
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS7B8250EVM

TPS7B8250EVM Specifications

TPS7B8250EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is LDO Voltage Regulators.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 3 V to 40 V.

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 5 V.

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 300 mA

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

18 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top