TPS92511EVM

Mfr. #: TPS92511EVM
メーカー: Texas Instruments
説明: LED Lighting Development Tools Evaluation Module
ライフサイクル: メーカー新製品
データシート: TPS92511EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS92511EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics LED Lighting Development Tools product type 1 of 100 Development Tools as subcategory 1. 5.707327 oz of Unit Weight

TPS92511EVM Image

TPS92511EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS92511EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: LED Lighting Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Series: TPS92511
  • Packaging: Bulk
  • Brand: Texas Instruments
  • Product Type: LED Lighting Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 5.707327 oz

TPS92511EVM

TPS92511EVM Specifications

TPS92511EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed LED Lighting Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: Is the cutoff frequency of the product Unit Weight?

    Q: Yes, the product's Unit Weight is indeed 5.707327 oz

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top