TRF370417EVM

Mfr. #: TRF370417EVM
メーカー: Texas Instruments
説明: RF Development Tools TRF370417 Eval Mod
ライフサイクル: メーカー新製品
データシート: TRF370417EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TRF370417EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Modulators / Demodulators type. Frequency range: 50 MHz to 6 GHz 5 V operating supply voltage range Dimensions of 38.1 mm x 38.1 mm x 1.579 mm Texas Instruments is a trusted brand for quality electronics Compatible with TRF370x. The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. RF Development Tools product type 1 of 100 Development Tools as subcategory

TRF370417EVM Image

TRF370417EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TRF370417EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: RF Development Tools
  • RoHS: E
  • Product: Evaluation Modules
  • Type: Modulators / Demodulators
  • Tool Is For Evaluation Of: TRF37041
  • Frequency: 50 MHz to 6 GHz
  • Operating Supply Voltage: 5 V
  • Description/Function: Quadrature modulator is used for up conversion of signals from the transmit chain DAC to the RF power amplifier device
  • Dimensions: 38.1 mm x 38.1 mm x 1.579 mm
  • Series: TRF370417
  • Brand: Texas Instruments
  • For Use With: TRF370x
  • Maximum Operating Temperature: + 85 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: RF Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TRF370417EVM

TRF370417EVM Specifications

TRF370417EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Modulators / Demodulators

  • A: What is the Frequency of the product?

    Q: The Frequency of the product is 50 MHz to 6 GHz.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 5 V.

  • A: Is the cutoff frequency of the product Dimensions?

    Q: Yes, the product's Dimensions is indeed 38.1 mm x 38.1 mm x 1.579 mm

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the For Use With?

    Q: The product For Use With is TRF370x.

  • A: At what frequency does the Maximum Operating Temperature?

    Q: The product Maximum Operating Temperature is + 85 C.

  • A: What is the Minimum Operating Temperature of the product?

    Q: The Minimum Operating Temperature of the product is - 40 C.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed RF Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top